Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 2 Years |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
product name | Stainless steel welded pipe/railing |
material | 201, 304, 304L, 316, 316L |
surface treatment | Polished, annealed, bright, mirror, matte |
certified | ISO etc. |
processing | Bending, welding, decoiling, punching, cutting |
Specification | Pipe material: Φ6-120mm; railing: customized according to customer requirements |
shape | Round, square, rectangular, oval, shaped, etc. |
pack | Customer requirements and standard export seaworthy packaging |
delivery time | 5-30 days depends on customer's request and quantity |
advantage | 1. Low basic cost |
2. Excellent after-sales service | |
3. Prompt delivery and close to the port | |
4. Excellent and high quality control; competitive price; | |
Package | Packaging according to customer requirements |
Application field | Widely used in automobiles, petroleum, food, chemical industry, construction, electric power, nuclear power, energy, machinery, biotechnology, papermaking, shipbuilding, boilers and other fields. Pipes can also be made according to customer requirements. |
Trade payment: | T/T, L/C, Paypal, Credit Card, Online Trade |
detection | Third party inspection is acceptable and the cost will be borne by the supplier. (required before signing the contract) |
Must Read
Buyer Reading
(1) Please be noted that the price in our website is merely the reference price and the actual one is subject to our final
confirmation!
(2) Any problem, requirement and suggestion, please contact us freely, we'd be very pleased to be at your side.
1. Where is your location?
We are located in No.3, Xinglong 3rd Street, Linjiang lndustrial Park, Dawang High-Tech
Zone, Zhaoging City, Guangdong Province, China
2. What is your MOQ requirement?
Our MOQ is 100 piece per fitting
3. How to get sample?
Sample is acceptable. Pls contact with us and advise what sample you would like.
4.How long is your delivery time?
It depends on order quantity and requirements. Normally 7-10 days for samples, 30-55 days for bulk order.
5.What is your payment condition?
T/T, L/C, Cash, etc. Normally 30% by T/T in advance, balance to be paid before shipment.
6. Can you produce according to samples or drawing?
Yes, we can accept OEM and ODM. Our key engineer has more than 15 years in hardware industry
7. How many fittings can you produce in one month?
Generally we can make more than 50,000 pcs monthly.